Global HSSE Policy

HSEQ ARE AT THE CORE OF ALL WE DO


Colt is uncompromising in its commitment to the protection of its employees, customers, community, and the environment. We maintain a safe and healthy workplace for all employees, suppliers, and visitors in compliance with all applicable laws and regulations.

With years of experience in the industrial leak repair industry, we have established ourselves as a trusted partner for businesses seeking reliable solutions that prioritize the well-being of their personnel, the quality of their operations, and practices that adhere to all relevant industry standards and regulations.

OUR COMMITMENT


Safety is at the core of everything we do. We understand the potential risks associated with industrial repairs, and we are dedicated to ensuring the safety of all individuals involved, from our skilled technicians to your on-site personnel. Our commitment to safety includes:

  • Documented procedures
  • Task oriented JSAs
  • Pre-job hazard assessments
  • Comprehensive permitting process
  • Owner / operator training
  • Management of change process
  • On-stream leak repair approval forms
  • API 570 inspection programs
  • Job tracking accountability
  • Temporary repair evaluation / replacement policy

DEDICATION TO QUALITY


At Colt, we understand that industrial leak repairs and specialty mechanical services must be executed with precision and excellence to minimize downtime and ensure the longevity of your equipment. Our commitment to quality includes:

Skilled Technicians: Our technicians are highly skilled and experienced in a wide range of leak repair techniques, enabling them to deliver solutions that stand the test of time.

Premium Materials: We source the highest quality materials for our repairs, ensuring that they are not only effective but also durable and reliable.

Technological Innovations: We invest in emerging technologies that enhance operational efficiency.

Continuous Improvement: We regularly review our processes and techniques to incorporate the latest advancements in leak repair, guaranteeing that our clients benefit from the most innovative solutions.

Client Collaboration: We maintain open lines of communication with our clients throughout the repair process, ensuring that our services align with their specific needs and expectations.

Custom Repair Solution for Highly Corroded, Oddly Shaped Fuel Gas Line

CLIENT CHALLENGE

  • A refinery needed a highly corroded line repaired with a full enclosure. 
  • The line’s odd geometry with multiple landing points required highly precise measurements.  
  • With three locking points in one direction, there was zero room for error.

COLT SOLUTION

  • In the pre-laser scanning era, the Colt team took all measurements by hand. Our 3D scanning technology now allows for fast, precise measurements to be captured. 
  • The solution was an interlocking enclosure design that involved combining two CNC enclosures and one welded enclosure together. 
  • Couplers that tied the enclosures together were an essential safety element of the highly precise design, providing room for the clamp to expand and contract when necessary, knowing the pipe would not.

CLICK HERE TO DOWNLOAD THIS PROJECT SPOTLIGHT

Learn More

Emergency Leak Repair Solution Designed, Fabricated and Installed in Under 8 Hours

A petrochemical facility was in the middle of start up when a leak occurred on their 1000psi steam system. Colt’s large stock inventory and strategically scheduled machinists enabled the flange clamp repair to be completed within 24 hours of calculation approval.

Learn More

Resources

Colt Overview Brochure Cover

Overview Brochure

Colt Group Leak Repair Cut Sheet

Leak Repair
Cut Sheet

Colt Mechanical Services Cut Sheet

Specialty Mechanical Solutions Cut Sheet

Colt Power Industry Cut Sheet

Power Industry Solutions Cut Sheet